
INVERTER


Scan with your authenticator app or enter the setup key.
Save these one-time codes. They cannot be viewed again.
Waiting for readings
EAS / NETWORK OPERATIONS
Live fleet health, site telemetry and incident response
GEOGRAPHIC OVERVIEW
Loading map…
ENTERPRISE OPERATIONS
Recorded intervals only; simulated inverter data is not physical runtime or confirmed VPN uptime
Network availability reflects ICMP responses, not confirmed VPN state

INVERTER
GENERATOR
ComAp CM3
Waiting for sample data.
Flow reflects reported input power, not switch position.
Simulated equipment · Battery cycle accelerated
Generator and battery durations are based on sampled inverter power; demo timings are accelerated
Waiting for data
| Time | Operator | Setting | Requested | Result |
|---|
Most recent 20 alerts. Recoveries remain in history.
Most recent 20 system and operator events.
| Time | Operator | Event | Details | Result |
|---|
| Time | User | Event | Details | Result |
|---|
Root controls global MFA. Super Admins manage individual MFA when enabled.
| Username | Role | Equipment controls | NOC | Gen policy | Maintenance | Status | MFA requirement | Authenticator | Actions |
|---|
MapTiler API key for satellite, street detail and globe mapping. Restrict the key to this NOC domain in the provider account.
TCP connection tests check reachability only.
New equipment is uncommissioned until a device driver is configured.
Quiet hours defer normal generator starts until the emergency reserve is reached. This policy is simulation-only; live generator scheduling requires a commissioned local controller.